HOME > PRODUCT > PM / NOx Application > DR & Peak-Cut Application
DR & Peak-Cut Application
Korea's First Integrated
DPF + Urea SCR
LG Energy Solution, Ochang Plant (2014~)
Selected through a rigorous technical evaluation among multiple DPF manufacturers for a commercial CPP system utilizing emergency diesel generators for Demand Response (DR) operations.
Integrated PM/NOx System
for DR and Peak-Cut
SK Ventium
Maintains Over 90% NOx Reduction Efficiency Even Under Severe Cyclic Load Variations Through Micro Urea Injection Control
Integrated PM/NOx System
for DR and Peak-Cut
Daedeok Biz
Integrated PM/NOx System
for DR and Peak-Cut
Hyundai Knowledge Industry Center

EMAIL. iglim@catech.co.kr | ADD. YongIn-Si, GyeongGi-Do, Korea (Zip, 17135) |
TEL. +82-31-336-6436,7 | FAX. +82-31-336-6434 |
COPYRIGHT Ⓒ 2026 CATECH. ALL RIGHTS RESERVED.

EMAIL. iglim@catech.co.kr |
TEL. +82-31-336-6436,7 |
ADD. YongIn-Si, GyeongGi-Do, Korea (Zip, 17135) |
FAX. +82-31-336-6434 |
COPYRIGHT Ⓒ 2026 CATECH. ALL RIGHTS RESERVED.